After the system is approved, we mobilize our crew and devices to the positioning and begin the rigging Procedure, which may contain assembling and positioning the crane, attaching rigging products into the load, and punctiliously lifting and relocating the load to its location. Through the procedure, we manage consistent communication https://avevaconstructions.com/