Project Highlight At a prominent confectionery site in York, Newsome has installed a efficient 400 kW chiller, marking the noteworthy conclusion of the project. Designed to advance ESG targets, the installation improves system dependability while minimising overall energy usage and CO₂ emissions. https://mediasocially.com/story5660588/advanced-400-kw-chiller-installation-secures-fifty-thousand-pounds-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-saving