Initially, the Jai Hind metro station was planned being elevated. Nonetheless, the AAI objected that the elevated stretch up towards the airport could possibly pose a threat to plane, Therefore the route was more reworked plus the station was shifted underground, 150 m through the Airport terminal building. The minimal qualification https://israelpdnxd.iyublog.com/31528778/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf